Lithuania: Polish gas pipeline successfully tested at maximum capacity
Launched in May, the Lithuanian-Polish gas pipeline GIPL has been tested at its maximum capacity. Two tests were carried out to make sure the pipeline could transmit the full gas flow in accordance with the technical parameters of the GIPL construction without any disturbances. According to the assessment of the Lithuanian and Polish TSOs operating…