The State Road Administration (ASD) announced on March 7 that six offers were submitted for the development of the Feasibility Study for four new road bridges over the Prut.
According to ASD, they are Costesti (MD) – Stanca (RO), Leova (MD) – Bumbata (RO), Leca (MD) – Falciu (RO) and Barboieni (MD) – Raducaneni (RO).
The deadline for the Feasibility Study is 12 months, and the projects provide for the construction of new road bridges, connecting roads to the existing infrastructure, border control points. (Moldpres/Business World Magazine)