Ukraine: ENTSO-E increases maximum electricity export capacity limit

The European Network of Transmission System Operators for Electricity (ENTSO-E) has increased the maximum capacity limit on Ukraine’s electricity exports to 550 megawatts. The relevant statement was made by Ukrenergo National Power Company Management Board Chairman Volodymyr Kudrytskyi on Facebook. “Starting from March 1, the maximum limit on the export of Ukrainian-produced electricity from Ukraine…

Ukraine: Ukrenergo’s efforts to restore Zaporizhzhia NPP’s backup power line complicated by Russian shelling

The repair crews of Ukrenergo National Power Company are trying to restore a backup line supplying electricity to Zaporizhzhia Nuclear Power Plant (NPP), but their efforts are complicated by continuous Russian attacks. The relevant statement was made by Ukrenergo National Power Company on Facebook. “Repair works at an overhead high-voltage power transmission line, which served…

Bulgaria: Kozloduy NPP confirms smooth transition to non-Russian nuclear fuel

Amidst concerns surrounding energy security and the transition away from Russian nuclear fuel, the executive director of Bulgaria’s Kozloduy Nuclear Power Plant (NPP), Valentin Nikolov, has reassured the public that there is no risk of operational disruptions. Addressing fears of potential shutdowns, Nikolov affirmed that none of the operating units at the Kozloduy NPP were…